Revelstoke Dam. (File)

Revelstoke Dam. (File)

B.C. hydro project granted an environmental assessment certificate

Revelstoke Project 6 has been approved with conditions from the province

  • Nov. 27, 2018 3:30 p.m.

An environmental assessment certificate has been issued to BC Hydro and Power Authority for the Revelstoke Generating Station Unit 6 project (Revelstoke 6 project), following a decision by George Heyman, Minister of Environment and Climate Change Strategy and Doug Donaldson, Minister of Forests, Lands, Natural Resource Operations and Rural Development.

BC Hydro proposes the installation of a sixth generating unit into an existing empty turbine bay of the Revelstoke Dam and the construction of a capacitor station.

READ MORE: City lists concern about Revelstoke Dam Unit 6 project

The generating station is situated on the Columbia River, five kilometres upstream from the Revelstoke, and on the asserted traditional territories of the Syilx Okanagan Nation, Ktunaxa Nation, Lakes Tribe and Secwepemc Nation. The capacitor station is proposed near Summerland and overlaps the traditional territory of the Syilx Okanagan Nation.

The Revelstoke 6 project would add an additional 500 megawatts (MW) of power generation to the dam, bringing the station’s total peak output power to 2,980 MW.

READ MORE: Revelstoke Dam expansion environmental review completed and waiting for ministry approval

Having considered the Environmental Assessment Office’s (EAO) assessment report and the recommendation of the executive director of the EAO to issue a certificate, the ministers are confident that the project will be constructed and operated in a way that ensures no significant adverse effects are likely to occur. A record of the factors that the ministers considered in making their decision can be found in the Reasons for Ministers’ Decision document at: https://projects.eao.gov.bc.ca/api/document/5bfc5c88688ac80024bc8550/fetch

In addition to the 20 conditions that are part of the Revelstoke 6 project’s environmental assessment certificate, design requirements are specified in the certified project description. Each of the conditions and the certified project description are legally binding requirements that BC Hydro must meet to maintain compliance with the certificate. BC Hydro is also required to obtain other federal and provincial permits to proceed with construction of the project. The plans required by the conditions must be developed in consultation with key government agencies and Indigenous groups.

Key provincial conditions for the project require BC Hydro to:

* develop a plan for the mitigation of impacts of the project on archeological and historical heritage resources in accordance with the Heritage Conservation Act for the life of the project;

* develop a fish habitat monitoring and management plan and a wildlife protection plan to mitigate, monitor and address impacts to fish and wildlife for the life of the project;

* develop a water-monitoring plan to monitor and mitigate impacts from the dam to water levels in the mid-Columbia River and Revelstoke and Arrow Lake reservoirs, channel and bank erosion, and discharge from the Revelstoke Dam to Arrow Lakes Reservoir; and

* support three Indigenous stewardship monitors during construction and the first five years of operations, represented by the Ktunaxa Nation Council, Syilx Okanagan Nation and Secwepemc.

In their reasons, the ministers acknowledged the EAO has taken extra efforts to understand broader issues that extend beyond Revelstoke 6’s specific impacts, to facilitate Indigenous reconciliation – notably the concerns of Indigenous groups with respect to the historical development of energy infrastructure on the Columbia River.

The EAO examined potential impacts of the project on Aboriginal rights and title (Aboriginal interests), and consulted deeply with the Syilx Okanagan Nation, Ktunaxa Nation and Secwepemc. An Indigenous consultation report is included in the decision materials for ministers and details the issues raised by Indigenous groups, the relevant mitigation and accommodation measures, and the EAO’s assessment of the seriousness of potential impacts on each Indigenous group’s Aboriginal interests.

The EAO also consulted with the U.S.-based Lakes Tribe through the Colville Confederated Tribes (CCT). Consultation with the CCT started in early 2018 following a B.C. Supreme Court decision that found the Lakes Tribe to hold Aboriginal rights within Canada.

The public was consulted throughout the environmental assessment process, which included holding four open houses with approximately 34 attendees and two public comment periods with five comments submitted. Following each public comment period, the EAO required BC Hydro to provide responses to key public issues and a report on how BC Hydro was addressing public concerns.

According to BC Hydro, construction of the generating station and capacitor station is expected to create 472 person years of direct employment for B.C. residents, with 403 person years of employment expected to come directly from the Revelstoke area over the 40-month construction period.

British Columbia’s environmental assessment process offers significant opportunities for Indigenous groups, government agencies and the public to influence the outcome of environmental assessments by providing input on the potential for environmental, economic, social, heritage and health effects from a proposed project.

Just Posted

/  Bob Friesen Photos
PHOTOS: Father’s Day Parade cruises through Mission

Taking It To The Streets event featured about 100 vintage vehicles

Alexis Paige Simpson has not been in contact with her family in two months. (RCMP photo)
Chilliwack RCMP looking for missing 20-year-old woman

Police say Alexis Paige Simpson has not been in contact with her family in two months

(Maps.Chilliwack.com)
RCMP seek dash-cam footage after Chilliwack road rage incident

Male driving a black pickup stopped and allegedly threatened to punch another driver

Deepak Sharma of Abbotsford has been convicted of the sexual assault of one of his cab passengers in West Vancouver in January 2019.
Former Abbotsford Hindu temple president convicted of sexual assault

Deepak Sharma assaulted a female passenger when he was a cab driver

A blood drive in support of 1-year-old Rielynn Gormley of Agassiz is scheduled for Monday, June 28 at Tzeachten First Nation Community Hall in Chilliwack. Rielynn lives with type 3 von Willebrand disease, which makes it difficult for her to stop bleeding. (Screenshot/Canadian Blood Services)
Upcoming blood drive in honour of Agassiz toddler with rare blood condition

The Gormley family has organized a blood drive in Chilliwack on June 28

The border crossing into the United States is seen during the COVID-19 pandemic in Lacolle, Que. on February 12, 2021. THE CANADIAN PRESS/Paul Chiasson
VIDEO: Border quarantine to soon lift for fully vaccinated Canadians

Eligible travellers must still take multiple COVID-19 tests

Chilliwack secondary school’s principal is apologizing after a quote equating graduation with the end of slavery in the U.S. was included in the 2020-2021 yearbook. (Screenshot from submitted SnapChat)
B.C. student’s yearbook quote equates grad to end of slavery; principal cites editing error

Black former student ‘disgusted’ as CSS principal apologizes for what is called an editing error

Skeena MLA Ellis Ross. (Photo by Peter Versteege)
BC Liberal leadership candidate condemns ‘senseless violence’ of Okanagan church fires

Skeena MLA Ellis Ross says reconciliation isn’t about revenge for past tragedies

A coroner’s inquest will be taking place at the Capitol Theatre in Port Alberni for the next week. (ELENA RARDON / ALBERNI VALLEY NEWS)
Teen B.C. mom who died following police custody recalled as ‘friend to many’

Police sent Jocelyn George to hospital after intoxication had gone ‘beyond the realm’ of normal detox

FILE - In this Nov. 29, 2020, file photo, Las Vegas Raiders defensive end Carl Nassib leaves the field after an NFL football game against the Atlanta Falcons in Atlanta. Nassib on Monday, June 21, 2021, became the first active NFL player to come out as gay. Nassib announced the news on Instagram, saying he was not doing it for the attention but because “I just think that representation and visibility are so important.” (AP Photo/John Bazemore, File)
Nassib becomes first active NFL player to come out as gay

More than a dozen NFL players have come out as gay after their careers were over

Penticton Indian Band Chief Greg Gabriel speaks to the Sacred Hearts Catholic Church burning down early Monday morning, June 21, 2021. (Monique Tamminga Western News)
Penticton band chief condemns suspicious burning of 2 Catholic churches

Both Catholic church fires are deemed suspicious, says RCMP

COVID-19 daily cases reported to B.C. public health, seven-day moving average to June 17, 2021. (B.C. Centre for Disease Control)
B.C.’s COVID-19 infections drop to 90 on Sunday, 45 Monday

Pandemic spread dwindles as 77% of adults receive vaccine

By protesting uninvited in First Nations’ territories, conservationists are acting in a neocolonial or paternalistic manner, says Huu-ay-aht Chief Robert Dennis. Photo by Heather Thomson
A closer look: do Vancouver Island First Nations support the war in the woods?

First Nations/environmentalist old growth alliance uneasy, if it exists at all

One Reconciliation Pole and two Welcome Figures were unveiled during a ceremony in honour of truth and reconciliation on National Peoples Indigenous Day at the Vancouver School District in Vancouver, B.C., on Friday, June 21, 2019. THE CANADIAN PRESS/Chad Hipolito
Horgan marks Indigenous Peoples Day by urging recognition of systemic racism

National Indigenous Peoples Day has been marked in Canada since 1996

Most Read