Skip to content

The dams’ day is due

I’ve been studying BC Hydro’s plan for upgrading their hydro dams. It’s a good plan and the public should support these upgrades even if it costs us all a tad more on our hydro bills.

I’ve been studying BC Hydro’s plan for upgrading their hydro dams. It’s a good plan and the public should support these upgrades even if it costs us all a tad more on our hydro bills.

Think about it: The last time BC Hydro built a new dam was back in the mid-1980s. There are other dams much older than that.

Do people think these dams will last forever if we don’t upgrade them every once in a while?

Donald LeungBurnaby