Pipes for the Trans Mountain pipeline project are seen at a storage facility near Hope, B.C., Tuesday, Sept. 1, 2020. THE CANADIAN PRESS/Jonathan Hayward

Pipes for the Trans Mountain pipeline project are seen at a storage facility near Hope, B.C., Tuesday, Sept. 1, 2020. THE CANADIAN PRESS/Jonathan Hayward

Canada Energy Regulator projects there may be no need for Trans Mountain expansion

Ottawa bought the existing pipeline for $4.4 billion in 2018

A new report from the Canada Energy Regulator projects that if Canada strengthens its climate policies to cut more greenhouse-gas emissions, it could eliminate the need for both the Trans Mountain expansion and the new Keystone XL pipeline.

The Energy Futures report, issued Tuesday, estimates energy production and consumption through 2050, based on two scenarios: one in which no more climate policies are introduced after this year and an “evolving” one where more initiatives are added to cut greenhouse-gas emissions.

Under the status quo scenario, the regulator projects the three pipelines under construction — Keystone XL, Trans Mountain and Enbridge Line 3 — will be the last ones needed to handle future growth in crude oil production. Under the evolving scenario, crude production still grows about 18 per cent before peaking in 2039, but the report says Line 3 alone is enough added capacity to handle that increase.

Cam Fenton, Canada team lead at 350.org (named for a “safe” level of carbon dioxide in the atmosphere) pointed out regulator twice recommended the government approve the Trans Mountain expansion, but is now projecting that Prime Minister Justin “Trudeau’s own actions on climate could make the pipeline he bought unnecessary.”

However Tim McMillan, president of the Canadian Association of Petroleum Producers, said not going ahead with all three pipelines would be a mistake.

He said stopping pipeline capacity to handle total maximum annual production doesn’t take into account ebbs and flows of shipments, comparing it to only building freeways using the total number of cars travelling daily, rather than during peak periods.

“That would be an inefficient transportation system,” he said. “In Canada we have struggled with under capacity or full capacity. Neither of those are efficient systems.”

Keystone XL is already in jeopardy because U.S. president-elect Joe Biden promised to rescind Washington’s approval for the cross-border project. Trans Mountain restarted construction in 2019 after pausing in 2018 because of the court decision on federal approval.

The Trudeau cabinet had to approve the Trans Mountain expansion twice, after the Federal Court of Appeal said the first approval lacked sufficient Indigenous consultation and environmental review.

Ottawa bought the existing pipeline for $4.4 billion in 2018, after Kinder Morgan Canada was threatening to walk away from the expansion project amid political opposition that was delaying construction.

Trudeau pledged Canada would expand it, and then sell it back to the private sector.

It’s currently estimated it will cost about $12.6 billion to expand the pipeline by building a nearly parallel version that will almost triple total capacity.

READ MORE: Fossil fuels to decline but remain big player in Canada’s energy use by 2050: report

Tom Gunton, a resource and environmental planning professor at Simon Fraser University, said the status quo scenario in the Energy Futures report is not realistic, since the government just introduced legislation last week to make getting to net zero emissions by 2050 legally binding.

The report itself notes to get to net zero, Canada will have to be more aggressive at moving away from fossil fuels than even what its “evolving” scenario lays out. The report says Canadians will still get almost two-thirds of their energy from fossil fuels by 2050 under the evolving scenario.

Net zero means any emissions still produced are absorbed by nature or technology, rather than left in the atmosphere to contribute to global warming. Gunton said the evolving scenario is the more likely situation in the report, and that scenario makes it pretty clear “you’re not going to need these pipelines, so you should at least defer or shelve construction.”

He said if the projections change, they can be revisited but at the moment we could be spending more than $22 billion to build pipelines that aren’t needed.

Canada Energy Regulator CEO Gitane De Silva told The Canadian Press in an interview that the goal of the report isn’t to comment on existing policy but to paint a picture of where things could go using a variety of assumptions.

“Really, our hope is that this information will help inform that policy process going forward,” she said.

A spokeswoman for the regulator also later clarified that the report is not saying whether or not any specific pipelines should be built, but rather looks at potential crude production based on a number of assumptions. The spokeswoman said the chart is not a forecast, and is not an attempt to assess the optimal capacity for Canada’s pipeline system.

Mia Rabson, The Canadian Press


Like us on Facebook and follow us on Twitter.

Want to support local journalism during the pandemic? Make a donation here.

oil and gasTrans Mountain pipeline

Just Posted

Brandon Hobbs (turquoise shirt), brother of missing Abbotsford man Adam Hobbs, gathers with other family and friends to distribute posters in Chilliwack on Thursday, June 17, 2021. (Jenna Hauck/ Chilliwack Progress)
Search efforts expand to Chilliwack and beyond for missing Abbotsford man

Family, friends put up posters in Chilliwack, Agassiz, Hope for missing 22-year-old Adam Hobbs

poster
Drop-in Covid vaccine clinic in Mission June 17-18

Neighbourhood clinics complement appointment-based clinics currently operating in Mission

Stock photo by LEEROY Agency from Pixabay
Drop-in vaccination clinics slated in Abbotsford for construction workers

Among three sites in Lower Mainland holding no-appointment clinics in June and July

A CH-149 Cormorant from 442 Transport and Rescue Squadron out of CFB Comox on a training exercise in Chilliwack on June 16, 2021. (William Snow photo)
VIDEO: Military search and rescue training in Chilliwack Wednesday

CH-149 Cormorant and CC-115 Buffalo from CFB Comox participated in downed aircraft rescue simulation

(Black Press Media files)
Get ready for mosquito season

Fraser Valley Regionsl District has already taken measures to curb the number of mosquitos

People line up to get their COVID-19 vaccine at a vaccination centre, Thursday, June 10, 2021 in Montreal. THE CANADIAN PRESS/Ryan Remiorz
Vaccines, low COVID case counts increase Father’s Day hope, but risk is still there

Expert says people will have to do their own risk calculus before popping in on Papa

Helen Austin performing with Trent Freeman at the 2018 Vancouver Island MusicFest. Austin is one of the many performers listed for the 2021 event.
Vancouver Island MusicFest goes virtual for 2021

Black Press to stream 25 hours of programming July 9-11

FILE – A science class at L.A. Matheson Secondary in Surrey, B.C. on March 12, 2021. (Lauren Collins/Surrey Now Leader)
Teachers’ union wants more COVID transmission data as B.C. prepares for back-to-school

BCTF says that details will be important as province works on plan for September

Provincial health officer Dr. Bonnie Henry outlines B.C.’s COVID-19 restart plan, May 25, 2021, including larger gatherings and a possible easing of mandatory masks on July 1. (B.C. government photo)
B.C. records 120 new COVID-19 cases, second vaccines accelerating

Lower Pfizer deliveries for early July, Moderna shipments up

A Heffley Creek peacock caught not one - but two - lifts on a logging truck this month. (Photo submitted)
Heffley Creek-area peacock hops logging trucks in search of love

Peacock hitched two lifts in the past month

The Calgary skyline is seen on Friday, Sept. 15, 2017. THE CANADIAN PRESS/Jeff McIntosh
2 deaths from COVID-19 Delta variant in Alberta, 1 patient was fully immunized

Kerry Williamson with Alberta Health Services says the patients likely acquired the virus in the hospital

The first suspension bridge is the tallest in Canada, with a second suspension bridge just below it. The two are connected by a trail that’s just over 1 km. (Claire Palmer photo)
PHOTOS: The highest suspension bridges in Canada just opened in B.C.

The Skybridge in Golden allows visitors to take in views standing at 130 and 80 metres

BC Green Party leader and Cowichan Valley MLA Sonia Furstenau introduced a petition to the provincial legislature on Thursday calling for the end of old-growth logging in the province. (File photo)
BC Green leader Furstenau introduces old-growth logging petition

Party calls for the end of old-growth logging as protests in Fairy Creek continue

B.C. Premier John Horgan leaves his office for a news conference in the legislature rose garden, June 3, 2020. (B.C. government photo)
B.C. premier roasted for office budget, taxing COVID-19 benefits

Youth addiction law that triggered election hasn’t appeared

Most Read