Drivers heading over the old Port Mann Bridge may be redirected onto some of the lanes of the new bridge as early as September

Drivers to get early use of new Port Mann Bridge

Some lanes open this fall to aid construction phasing

Motorists may be driving over part of the new Port Mann Bridge as early as September.

Tolls won’t be charged until the bridge formally opens with eight out of 10 lanes operational in December.

But Port Mann/Highway 1 Project spokesman Max Logan said some traffic will begin using at least a couple of lanes sometime this fall.

Shifting some traffic onto the new bridge will help with construction staging as crews still have extensive work ahead of them in the months ahead, notably in completing new overpasses at the Cape Horn interchange on the Coquitlam side.

“It could be as early as September,” he said. “It’s likely to be the eastbound lanes that are moved first. The details of that and the timing is still being worked out with the contractor.”

Logan likens the early lane openings to the traffic pattern changes that have seen exits and on-ramps shift to accommodate work along the 37-kilometre construction corridor.

“By shifting some lanes over to the bridge not only does that create some work space for us it also allows us to transition traffic gradually over to the new bridge.”

He said the transportation ministry wants to avoid anything like California’s multi-day freeway construction closures that have been dubbed Carmageddon.

“Phasing more gradually will minimize the impacts to traffic,” he said.

Drivers will be given plenty of advance warning of any changes, he said.

Logan said drivers won’t experience the full travel time savings until the initial eight lanes of the new bridge are open and electronic tolling begins.

It will take another year before all 10 lanes are in service, because the old bridge must be taken down before the last two lanes of the new span can be connected to Highway 1.

Transportation Minister Blair Lekstrom has said the planned $3 per crossing minimum toll may be lowered for the first year while only eight lanes are open. Tolling details are to be released in early September.

Also slated to open in December is the northeastern leg of the South Fraser Perimeter Road, which promises a quick route to and from the Pattullo Bridge for drivers who want a free crossing, although critics predict heavy traffic on other roads in north Surrey, Delta, New Westminster and Burnaby.

Still to be determined is how a promised Highway 1 rapid bus service over the new bridge will be launched by cash-strapped TransLink.

Just Posted

UPDATE: Fuel truck hits train in Port Coquitlam, causing massive fire

CP Rail reporting no injuries, driver of truck is safe.

Mission RCMP recover 22 stolen vehicles and several firearms

Charges are still pending after police search two separate properties

Fraser Health asking taxpayers for millions more in health care capital funding

Health authority wants Fraser Valley taxpayers to triple annual contribution to $5.75 million

UPDATE: Brother of teen killed by stray bullet in Vancouver says the death left a void

Alfred Wong, 15, was gunned down while on his way home from dinner with his family

UPDATE: Rockslide keeps Coquihalla northbound lane closed

Highway 5 is closed in one direction.

Testing the Google Arts & Culture app

Going face to face with art

Back to work: U.S. government shutdown ends after Democrats relent

Short-term spending measure means both sides could see another shutdown stalemate in three weeks

Man lives despite malfunctioning defibrillator at B.C. arena

A middle-aged man went into cardiac arrest after at game at Pitt Meadows Arena last Wednesday.

Cause of Northern B.C. seaplane crash released

TSB releases report on seaplane crash during a water landing in 2016 near First Nations community

Vancouver police crack down on pop-up pot vendors

Officers raided merchants’ tables on Robson Square late Sunday

Bell Media, NFL take appeal over Super Bowl ad rules to top court

At issue is a ban on substituting American ads with Canadian ones during the game’s broadcast

Crown seeks 4.5 years jail for B.C. woman convicted of counselling tax evasion

Debbie Anderson the latest from group to face jail for teaching debunked ‘natural person’ theory

Movie filmed in Castlegar B.C. opens Friday

Hollow in the Land starring Dianna Agron will be playing in select cinemas.

Semi rollover on Highway 3

Highway 3 is reduced to single-alternating lanes

Most Read